» Home  » Careers  » News  » Enquiry Form  » Contacts & Locations » Login
homeaboutproductsservicescareerscontact

30th July 2015
SPEC delivers Ammonia Dosing System for end user SUEZ Oil Processing Company in Egypt.

4th July 2015
SPEC hands over multiple vessels to Dragon Oil for installation in their offshore Oil rig in the Caspian Sea. All vessels were designed and built to ASME Sec. VIII Div.1, supplied with level bridles, service platforms, sacrificial anodes, mating flanges, internal epoxy coating, external painting and insulation.

29th June 2015
SPEC successfully hands over fully commissioned 2 x 35 MMSCFD capacity Glycol (TEG) Dehydration type natural gas process plant, gas gathering pipelines and associated facilities to Bangladesh Petroleum Exploration and Production Company Ltd (BAPEX).

24th June 2015
SPEC completes Tanker Loading Facilities for end user DANA GAS EXPLORATIONS FZE. Project was executed on EPC basis and included supply of Loading Arm Package and complete Civil works at Dana Gas site in Hamriyah.

14th June 2015
SPEC has been awarded project for Design, Manufacture, Inspection, Testing, Installation and Commissioning of a new EPF (Early Production Facility) for Hunt Oil’s Ain Sifni Phase I development plan.

1st June 2015
ISO 9001:2008 Repeat audit successfully completed.

20th May 2015
SPEC inaugurates new 30,000sq.mtr fabrication facility at the Jebel Ali Free Zone in Dubai. With this facility SPEC has more than doubled its manufacturing capacity and office space in the UAE. Equipped with a 100 Ton overhead crane, the new fabrication facility is equipped to handle larger sized modular skids.

18th May 2015
SPEC successfully completes commissioning of 2 x 35 MMSCFD Glycol (TEG) Dehydration type natural gas process plant , gas gathering pipelines and associated facilities on turnkey basis for Bangladesh Petroleum Exploration and Production Company Ltd (BAPEX).

15th May 2015
SPEC delivers horizontal Heater Treater Skid Package to Egyptian Maintenance Company (EMC), equipped with 2x7 MMBTU burners with internal painting and cathodic protection and controlled by PLC based control panel.

3rd April 2015
SPEC delivers to GE two Suction Scrubbers, two Discharge Scrubbers and one Vertical Scrubber on fast track basis with equipment ready to ship within three weeks.

3rd April 2015
SPEC delivers to GE two Suction Scrubbers, two Discharge Scrubbers and one Vertical Scrubber on fast track basis with equipment ready to ship within three weeks.

2nd March 2015
SPEC wins contract for supply of 2 x 2130kW Water Bath Heater Packages and Diesel Supply System for LAM and ZHDANOV fields located about 35 km off Turkmenistan in the Caspian Offshore for End User Dragon Oil (Turkmenistan) Ltd, (DOTL).

18th February 2015
SPEC secures EPC Contract for Tanker Loading Station from Dana Gas Exploration FZE. This project is part of the Zora Gas Field Development Project located in Sharjah, UAE.

7th January 2015
SPEC’s readies 15,000 BPD low API Heater Treater which is destined for Egypt’s Petrobel. The Heater Treater is completely modular and designed for easy installation and operation. It features a an electro-pneumatic system, an Allen Bradley PLC with Local HMI, dual fired burners, skid lighting and local F&G detectors.

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

SPEC is a vertically integrated engineering and fabrication company providing turnkey process solutions to the Oil and Gas Sector. With strategically situated global engineering and fabrication facilities, SPEC offers complete solutions to our client. SPEC’s key advantages are in the services supplied, areas of operation and competitive pricing..

» read more..
location map
    Resolution 1024 x 768. Copy Right © SPEC Oil & Gas Technologies